Friday, 21 March 2014

Fire, fire

It's the weekend of fire!

Front room fire. Come the 4th April, this will be a log burner. The slate is down. Needs to be rendered. And then the chimney gets lined and the burner is in. Roll on winter :)

Thanks to Batley Barless,









And tomorrow, we are off to York. They have loads of old fireplaces. So we should get one to fit. Don't want a boring old wall. Do we?











In general, it's now a plastering whirl wind.

Tuesday, 18 March 2014

Storage, everyone likes storage.

The fitted wardrobes have been, well fitted. What else. A little bit of an oops. There's supposed to be two mirrored doors. Now ordered by Dan, Dan the wardrobe man, of Yorkshire Wardrobes.

 The view east. Jay's dressing table. With electrified drawers. Keep those hair electrical appliances in the drawer, with no trailing wires.
The view west.

Plenty of cupboards. The right has 20cm shelves, but we have straight lines. 3 or 4 different levels on that wall.

The drawers in front of the loft access was planned. Everybody, me, Jay, Lee the builder and Dean the decorator, thought major boo boo. They were fixed! Nope, as requested they look fitted, they aren't. Very clever.

Saturday, 8 February 2014

DIY SOS....

.... or the more extravagant American version - Extreme Makeover. If you've ever seen one of these shows with different workmen everywhere you look, all tripping over each other in a small space, then you can picture what it's been like at the house this week!



We've had two builders outside working on the second extension, two joiners making doorframes inside, and roof battens outside, two electricians, a plumber, a plasterer, and a decorator. Not to mention occasional visitors such as Daniel who came to do the second measuring for the fitted wardrobes, and the two window fitters who've been there today!

It's been a very busy and very chaotic week, but at the end of it, things have really moved on. We now have lights on the top two floors - including a bathroom mirror with a remote control, and many different colour settings on the flourescent lights down each side (bathroom disco anyone?) I'm sure it didn't mention that on the website when I ordered it!

We've had quite a bit of decorating done by Dean - although there was a slight miscommunication about the colour in our bedroom, which was dark grey briefly midweek! Now corrected. We have new windows in the front of the house - cream woodgrain effect ones, which look so much better than the old leaded white uPVC ones. All the new bathroom fixtures have been delivered, so we need the plumber to come and make a start on that as soon as he can, and hopefully the roofers will be on site this week to put the slates on the extension at the back.

We still have a very long way to go, but it now seems that things are moving really quickly, which is great! More photos to come soon.

Jay

Thursday, 10 October 2013

Let There Be Light!

 Ok, so we did say we wanted lots of light in the loft conversion, but this may be a step too far!

As you can probably guess, from the picture - looking up from the current master bedroom - things have definitely started moving.

We had a few days away last week, and had a call from the builder asking if the door between the house and conservatory was locked. We told him it was, which was just as well, as they were in the process of breaking into the conservatory to put scaffolding legs straight through the roof!

The chimney and chimney breast has been removed all the way through the house, all the upstairs ceilings have been removed so they can be lowered to create more head height in what will become the master suite in the loft, and they're currently removing the roof so it can be felted and replaced. We seem to be steaming ahead.

I've said all along that I was glad we didn't have to live in the house while it was being renovated, but I've never been as glad as today when Lee - our builder -  told us that without doubt the two messiest jobs you could have done were to remove a chimney breast and lower a ceiling - and we've done both!

There's no mevement on the extensions yet as he's still working on another job, but the joiners are going full steam ahead with the loft, and as soon as Lee finishes up, he'll move to ours full time. In the meantime he has some of his workers moving between the two projects to try and keep ours going.

We finally feel like we're getting somewhere!

Jay.






Saturday, 27 July 2013

Moving Forward ..... Slowly!

We were on holiday last week, which was lovely, but had an email while we were away from the architects. They wanted to set up a meeting with the structural engineer we'd hired on their recommendation. A little strange, as we'd originally been told that there should be no need for a site visit - he would just work from their measurements. However, as we basically have no clue what we're doing, all we can do is agree and go along with it!

The meeting took place on Tuesday. The engineer seemed friendly and very very knowledgeable. Everything we want to do seems do-able, although I'm really worried about the costs. We can't put the project out to tender and get quotes from builders until we have the more detailed drawings needed for building regulations, which means at the moment we have no idea whether or not we'll be able to afford everything that's in the plans. Catch 22 really - we can't get a quote without the plans, and yet it seems silly to do the plans if we may not be able to afford the work.

We've stressed (again) to the architects that we're keen to press on and get things moving, so hopefully we'll have the final plans soon and can get some quotes.

Jay